Preliminary Front End Engineering Design (Pre-FEED) for Pre-combustion carbon capture in an Integrated Steel Plant (ISP) for low-carbon emission steel production.
Decarbonization of BF-BOF based 5 Mtpa integrated steel plant with lowest possible cost impact for meeting sustainability goals.
Scope under Pre-FEED included: